When their 40-year-old Buderus unit failed, this multi-use building knew it was time to replace it.
The 500,000 BTU unit provided heat and hot water to the private and business residents of their property, and they needed the work done quickly. Our team took on the job of retrofitting a new heating system that would meet the needs of the different tennants that relied on hot water.
We placed the boiler with twin Burnam cast-iron units that will stage on and off, adding redundancy while meeting the building’s BTU requirements. As part of the installation we:
It took less than a week on-site to replace everything and get the building back to full working order.